Please use this identifier to cite or link to this item: https://www.um.edu.mt/library/oar/handle/123456789/65881
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHerdiwan, Aysha-
dc.contributor.authorWidiyanesti, Sri-
dc.date.accessioned2020-12-16T07:21:46Z-
dc.date.available2020-12-16T07:21:46Z-
dc.date.issued2015-
dc.identifier.citationHerdiwan, A., & Widiyanesti, S. (2015). An analysis of machine effectiveness on the production line by using overall equipment effectiveness (OEE) method based on total productive maintenance (TPM) principle (a study case of Ball Tea machine in PT Kabepe Chakra). Journal of Corporate Governance, Insurance and Risk Management, 2(1), 106-118.en_GB
dc.identifier.issn2757-0983-
dc.identifier.urihttps://www.um.edu.mt/library/oar/handle/123456789/65881-
dc.description.abstractTotal Productive Maintenance (TPM) is an approach in Preventive Maintenance which can be used by a company to evaluate the effectiveness of the company’s facility. This evaluation is conducted to improve the facility value of Overall Equipment Effectiveness (OEE) and to eliminate the main loss known as The Six Big Losses. TPM is a maintenance approach focusing on the equipment which is suitable to be implemented on the manufacture company and production industries. This research is conducted on the Ball Tea machine in PT Kabepe Chakra which is a production machine to dry tea. The calculation of OEE value is conducted based on the data in January-December 2014, the calculation results show that the OEE value is 59.30897433% and it is still under the World Class standard. The calculation of Six Big Losses shows that the percentage of the most dominant of machine losses is on the Set-Up and Adjustment Loss which is 42.6768183%. The research results can be used to show that the effectiveness of Tea Ball machine still has to be improved by focusing on the most dominant loss elimination.en_GB
dc.language.isoenen_GB
dc.publisherGovernance Research and Development Centre, Croatia & University of Malta, Faculty of Economics, Management and Accountancy, Department of Insuranceen_GB
dc.rightsinfo:eu-repo/semantics/openAccessen_GB
dc.subjectTotal productive maintenanceen_GB
dc.subjectMaintenanceen_GB
dc.subjectEquipment health monitoringen_GB
dc.subjectAssembly-line methodsen_GB
dc.titleAn analysis of machine effectiveness on the production line by using overall equipment effectiveness (OEE) method based on total productive maintenance (TPM) principle (a study case of Ball Tea machine in PT Kabepe Chakra)en_GB
dc.typearticleen_GB
dc.rights.holderThe copyright of this work belongs to the author(s)/publisher. The rights of this work are as defined by the appropriate Copyright Legislation or as modified by any successive legislation. Users may access this work and can make use of the information contained in accordance with the Copyright Legislation provided that the author must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the prior permission of the copyright holder.en_GB
dc.description.reviewedpeer-revieweden_GB
dc.publication.titleJournal of Corporate Governance, Insurance and Risk Managementen_GB
Appears in Collections:JCGIRM, Volume 2, Issue 1, 2015
JCGIRM, Volume 2, Issue 3, 2015

Files in This Item:
File Description SizeFormat 
JCGIRM2(1)A8.pdf271.49 kBAdobe PDFView/Open


Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.