Please use this identifier to cite or link to this item:
https://www.um.edu.mt/library/oar/handle/123456789/84290
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Borg, Ruben Paul | - |
dc.date.accessioned | 2021-11-19T10:49:02Z | - |
dc.date.available | 2021-11-19T10:49:02Z | - |
dc.date.issued | 2008 | - |
dc.identifier.citation | Borg, R. P. (2008). Assessment of a bridge structure, demolition & recycling of materials. Cost Action C25, Drezden. | en_GB |
dc.identifier.isbn | 9783867800945 | - |
dc.identifier.uri | https://www.um.edu.mt/library/oar/handle/123456789/84290 | - |
dc.description.abstract | In the appraisal of deteriorated structures, a comprehensive investigation and a detailed assessment of damages are necessary. Intervention options, proposed for rehabilitation or reconstruction, must be based on the assessment of the structure, and on various factors, including constraints specific to the project. An investigation was carried out on a deteriorated concrete bridge structure in Malta. The investigation was followed by an assessment of damages. The proposals for reinstatement were based on the damage assessment, and also on other criteria which were specific to the particular project. The proposed solution included the demolition of the existing deteriorated bridge superstructure, and renewal of the superstructure as a continuous 3-span cast in place box girder, together with the rehabilitation of the substructure. Various waste materials were considered for recycling, including in particular the steel reinforcement, and the concrete. | en_GB |
dc.language.iso | en | en_GB |
dc.publisher | COST | en_GB |
dc.rights | info:eu-repo/semantics/restrictedAccess | en_GB |
dc.subject | Bridges -- Maintenance and repair -- Malta | en_GB |
dc.subject | Concrete -- Recycling | en_GB |
dc.subject | Concrete construction | en_GB |
dc.subject | Reinforced concrete -- Malta | en_GB |
dc.subject | Bridges -- Design and construction -- Malta | en_GB |
dc.title | Assessment of a bridge structure, demolition & recycling of materials | en_GB |
dc.type | conferenceObject | en_GB |
dc.rights.holder | The copyright of this work belongs to the author(s)/publisher. The rights of this work are as defined by the appropriate Copyright Legislation or as modified by any successive legislation. Users may access this work and can make use of the information contained in accordance with the Copyright Legislation provided that the author must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the prior permission of the copyright holder. | en_GB |
dc.bibliographicCitation.conferencename | Cost Action C25 | en_GB |
dc.bibliographicCitation.conferenceplace | Dresden, Germany, 2008 | en_GB |
dc.description.reviewed | peer-reviewed | en_GB |
Appears in Collections: | Scholarly Works - FacBenCPM |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
P014_C25_Book2_Midterm_Conference_Dresden_2008.pdf Restricted Access | 1.02 MB | Adobe PDF | View/Open Request a copy |
Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.